Manufacturing
A factory is judged by what it can change without sending the job out. Here that is the mould, the print and the pack — all three are in the same building in Gaoqiao.

Tooling
Moulds are cut on our own machining centre, not bought in. A wall thickness change, a new lid thread or a capacity tweak is a conversation with the tool room rather than a new purchase order.
CNC machining centre, with CAD, CAM and CAE facilities for part design and mould flow checks.
First shots measured against the drawing, then re-cut until capacity, wall and lid fit agree.
Existing tools adjusted for a buyer’s change of size or colour rather than re-tooled from zero.

Decoration
Three processes, one print room. The choice is made against the artwork, not against the machine that happens to be free.
| Process | What it gives you | Usually chosen for |
|---|---|---|
| Water transfer | Photographic, full-wrap artwork around a curved wall. | Dense seasonal and gift artwork. |
| Screen | Solid spot colours and fine type, direct on the body. | Logos and one-to-four colour marks. |
| Heat transfer | Sharp multi-colour graphics on flat panels. | Premium retail graphics. |
Assembly and packing
The last step is where most plastic housewares lose their margin. Ours stays under the same roof as the mould.
Double-wall bodies, lids, straws, pumps and dispensers assembled and checked before packing.
Printed sleeves, colour boxes, hang tags and barcodes prepared for shelf or e-commerce.
Bulk cartons sized for container loading out of Ningbo, with packing lists matched to the order.
Capacity, wall thickness, lid fit and print register verified through the run, not only at the end.